Library refurbishment works: 5-22 May

Image of refurbished University Library surrounded by seating, trees and hedges.Between 5– 22 May the following work is expected to be carried out inside the Library building:

  • Mechanical and electrical works will carry on across various points throughout the building.
  • Ground, 1st and 3rd Floors work will continue and there may be concentrated activity around the staircase enclosed behind the white hoardings.

Study space across campus

Including the study space inside the URS Building, there are approximately 1,700 spaces available for study on campus (subject to teaching timetabling and departmental use).

Stay up-to-date

Keep checking the Library blog for the latest news and updates.

See our dedicated URS Building page for details of Library services here, maps and opening times.

All of the above can be easily accessed through our Library refurbishment project page: www.reading.ac.uk/library/refurb.

Rachel Redrup, Marketing Co-ordinator
for UoR Communications